Valley View Middle School is an existing school for the Snohomish School District that is to be replaced with a new school on the same 40-acre site. This project is being designed under the International Living Building Institute's Living Building Challenge to meet the highest standards of sustainability surpassing WSSP protocol.

 

H&AI is completing the Civil Engineering for the project, low impact design items include: 

 

Porous Concrete Pavement - This material will be used for the bus service road and will greatly reduce the impervious surface footprint on the site, assist in mitigating increased stormwater runoff, and provide stormwater treatment capabilities.

 

Geoblock®2 Driving Surface - Geoblock®2 is capable of supporting heavy vehicles, including fire trucks, yet provides a grassed surface for aesthetic beauty. This surface is proposed for the fire lane and auxiliary parking stalls.

 

Rain Gardens - Approximately 7 rain gardens are proposed throughout Valley View to collect and treat runoff from the parking lot surfaces.

 

Rainwater Cisterns - Rainwater will be collected off of roof surfaces. After passing through a simple filter, this water will be used for non-potable fixtures such as toilet flushing and outdoor hose bibs. These cisterns reduce the demand on the public utility district, and save utility operating costs for the client.

 

Rainstore Underground Storage - The underground stormwater detention facility will provide multiple functions for the site. First, it will regulate stormwater runoff from impacting downstream drainage channels. Second, the system is perforated to promote infiltration into the underlying soils. This helps to recharge groundwater and reduce the storage volume and corresponding footprint. Finally, the system discharges to two separate wetland corridors to keep the hydrologic functions and values of these wetlands from being impacted.

 

Erosion Control - Extensive erosion control was incorporated into the civil drawings in order to protect the existing wetlands and streams adjacent to the construction area from approximately 95,000CY of grading activity. Additionally, effort was made to separate stormwater run-on from intermixing with the construction site stormwater, reducing the need for sedimentation ponds and other controls. 

 

Services Provided:

Civil Engineering

 

For more photos click here to visit our Facebook album 

Gallery: Valley View Middle
 Valley View Middle School
VVMS Buildings
PausePlay
Valley View Middle School
VVMS Covered Play
VVMS Main Entry
VVMS Site Plan
VVMS Buildings