Beach Drive Culvert Replacement

City Beach Drive Culvert Replacement

Island County, WA

 

Harmsen & Associates, Inc. completed civil engineering services for an emergency culvert replacement project in Island County. The project provided for the removal of a failed corrugated metal pipe and installation of a new 72” DuromaxxTM polyethylene pipe. Click here to read about the use of inflatable water dams during installation.

 

Culvert and Water: The culvert was installed in a corrosive salt water environment at a road crossing between two lagoons. The project included coordination with the local water district for shutoff of a watermain that was replaced as it was exposed during the excavation process.

 

Civil Design: Our work involves design of the Temporary Erosion and Sediment Control (TESC) measures, including:

    •  Coffer dams and pumping

    •  Installation and backfill for the new culvert

    •  Roadway reconstruction

    •  New walkway for the local residents

 

Coordination: We worked closely with the County’s Managing Engineer and coordinated with the utility owners.

 

Landscape Architecture: The project also required us to provide a planting plan for both ends of the culvert pipe and quarry spalls.

 

Services Provided:

Civil Engineering    Landscape Architecture

 

Gallery: City Beach Drive
 Beach Drive Culvert Replacement
Beach Drive Landscape Plan
PausePlay
Beach Drive Culvert Replacement
Beach Drive Culvert
Beach Drive Existing Culvert
Beach Drive Landscape Plan