Beach Drive Culvert Replacement
City Beach Drive Culvert Replacement
Island County, WA
Harmsen & Associates, Inc. completed civil engineering services for an emergency culvert replacement project in Island County. The project provided for the removal of a failed corrugated metal pipe and installation of a new 72” DuromaxxTM polyethylene pipe. Click here to read about the use of inflatable water dams during installation.
Culvert and Water: The culvert was installed in a corrosive salt water environment at a road crossing between two lagoons. The project included coordination with the local water district for shutoff of a watermain that was replaced as it was exposed during the excavation process.
Civil Design: Our work involves design of the Temporary Erosion and Sediment Control (TESC) measures, including:
• Coffer dams and pumping
• Installation and backfill for the new culvert
• Roadway reconstruction
• New walkway for the local residents
Coordination: We worked closely with the County’s Managing Engineer and coordinated with the utility owners.
Landscape Architecture: The project also required us to provide a planting plan for both ends of the culvert pipe and quarry spalls.
Services Provided:
Civil Engineering Landscape Architecture
|
Gallery: City Beach Drive
Beach Drive Landscape Plan
![]()
![]() ![]() ![]() ![]() |





